For my sime 60 problem I called in an engineer. The problem was that the system simply needed to be repressurised! I understand that systems like this lose pressure over time and repressurising is then needed. I am very thankful that the professional engineer that solved the problem also educated me about this matter for the future.
vee ess
December 2007